So, putting it all together, we have the potential for creating community-built, low-cost housing developments that are humanly-livable and ecologically sound. The project is in McGregor, having started mid-January, and building work is during the weekdays. We are aiming to complete by April. So if you have time to spare – come join us slinging mud!! This page will get longer as the cottage gets higher - so check back often! |
|
And in the Beginning....... |
|
Part of the massive rock bank under the house |
Wooden trusses |
Stones for foundation |
Brick making |
Albertus, wood and bricks |
South wall |
Day1 |
|
Little Cottage Foundations |
Digging foundations |
Filling the trenches |
Filling the trenches |
Filling the trenches with stone |
Hennie stamping the foundations |
Day 2 |
|
Filling outside foundations |
David and Monica stamping cob |
David in cobbing line |
David catching in cobbing line |
Hennie in cobbing line |
Collecting stone to fill foundations |
Cobbing between the stones |
|
Day 3 |
|
Off loading wood
|
North East wall
|
Nice end of the day
|
Look what we have accomplished |
Hurrah we did it |
Hennie putting in corner stake |
David building cob and stone wall
|
Cutting Post
|
Cobbing Line
|
Building
|
Day 6 |
|
Elke arriving with reed
|
Elke arriving with more reed |
Day 7 |
|
Wattle |
Stone footing
|
Foundations for the chimney
|
Wattler Elke in the cupboard |
Cross brace
|
|
Day 8 |
|
Jill sanding splash back
|
More infrastructure going up |
First cob laid
|
End of the day |
Paul lending a hand
|
|
Day 9 |
|
Cupboard latte finished |
Getting dimensions for window
|
First adobe bricks laid
|
Fetching adobe bricks
|
Days 10, 11, 12, 13, 14, 15, 16 and on - as all the days start to role into one! |
|
Day 10: Wall at the end of the day |
Day 11: Door frame goes into west wall
|
Day 12: Stone fireplace |
Day 13: Elke is back |
Day 14: Di learns to make cobs |
Day 14: Latte is finished |
Day 14: South wall
|
Day 15: Fireplace growing |
Day 15: Paul building
|
Day 16: More building |
Day 16: First shelf
|
Day 17: First window - from a motor car!
|
Day 17: We dig up a bottle and some bulbs.
Can you think of a message we can put in the
bottle to send to the future?
|
Day 17: Zachie joins us
|
Day 18: Form to hold arch over fireplace |
Day 18: Varnishing the windows
|
Day 19: Farewell braai for Chris
|
Day 19: The team
|
Day 20: First bathroom window
|
Day 23: Dining room windows
|
Day 21: Zachie daubing the wattle
|
Day 22: Alex arrives to make documentary
|
Day 24: First desk top |
Day 25: Second desk top
|
Days 26 to 40 |
|
Day 26: Windows up to lintel height |
Day 26: Kitchen taps in place
|
Day 28: Zachie covering the pipes
|
Day 29: Hansie builds the box
|
Day 30: Harold with hole for extra window in main bedroom
|
Day 30: Elke back for a visit
|
Day 31: Cobbing in window in main bedroom |
Day 32: Compost toilet getting its covering |
Day 33: Botttles in window
|
Day 36: Lintels over bottle windows
|
Day 37: Air vents in main bedroom completed
|
Day 38: Front veranda
|
Day 39: Lining it up
|
Day 40: All posts up and beam ready to go up
|
Days 41 to 48 |
|
Day 41: A Nice butterfly window in place |
Day 41: On top
|
Day 42: Drilling to put peg in
|
Day 43: Latte from below higher than it looks
|
Day 44: Cross beam and wattle, finally all the house tied together |
Day 44: Supper in the solar cooker
|
Day 47: One side of reed finished
|
Day 48: Are we in luxury or what
|
Day 48: Janae holding the reed in place
|
|
Days 49 to 69 |
|
Day 49 Charles doing the reed. |
Day 50 off loading the roof trusses |
Day 50 down the bathroom
|
Day 51 picking up stone to fill vernada floor
|
Day 52 latte attached to the beam
|
Day 53 the challenge to get the roof done today |
Day 54 completed veranda roof from below
|
Day 55 both flat roofs on
|
Day 55 floor in main bedroom laid
|
Day 56 Tatiana and Monica sealing beams for trusses with boron |
Day 57 Heave Ho
|
Day 57 Jacque securing truss
|
Day 58 going up
|
Day 60 Hurrah all up
|
Day 61 other desk in second bedroom
|
Day 62 First fire in fireplace
|
Day 63 cupboard in Main bedroom
|
Day 63 wall above fire place
|
Day 64 building up the chimney
|
Day 65 calling themselves the chain gang
|
Day 66 stone wall and first pole for the deck
|
Day 67 Building on north wall.
|
Day 68 more reeds
|
Day 69 northwall
|
Days 70 to 95 |
|
Day 70 growing gablefrom outside
|
Day 71 air vent in place |
Day 75 house beginning to take shape
|
Day 75 last of windows in and fixing line for parapet
|
Day 76 sink
|
Day 76 Bevan giving Hennie water. Bevan says he and his girlfriend are going to enjoy the
langarm dance on Saturday
|
Day 77 south gable
|
Day 77 nice south gable |
Day 78 stone corner
|
Day 79 Deck
|
Day 81 water channel across front of house |
Day 81 lounge floor complete
|
Day 83 deck base
|
Day 83 bathroom cupboards
|
Day 84 Plastering main room cupboard |
Day 89 koskassie waiting for its place of glory
|
Day 90 bench waiting to be cobbed
|
Day 92 redrilling a beam
|
Day 93 carrying cob to veranda
|
Day 94 the deck bench
|
Day 95 the cottage is being given it's skin
|
|
Days 96 to 112 |
|
Day 96 plastering team
|
Day 98 traditional roof wetting braai
|
Day 97 getting doors redy to be hung on Saturday - bathroom door |
Day 99 Cupboard doors being prepared
|
Day 100 Main bedroom and bathroom corner with shelving
|
Day 101 the Basin from Janna
|
Day 102 Hennie screeing topping
|
Day 104 finishing veranda floor
|
Day 105 Albertus plastering
|
Day 106 Waldorf Pupils learn about natural building
|
Day 107 final layer goes on
|
Day 108 start of electrical installation
|
Day 109 first layer of plaster on lounge floor |
Day 110 Albertus finishing final coat on north gable |
Day 103 Gas geyser in
|
Day 110 North wall finished
|
Day 111 east wall finished just the bench now it is too wet
|
Day 112 Hennie plastering in Bathroom |
Days 113 to THE END!!!! |
|
Day 113 Walls in main bedroom, finished floor curing |
Day 114 Monica pointing east wall
|
Day 115 New toilet seat
|
Day 118 All railings in sleeping platform up
|
Day 119 Luyanda, Diane and Alexs visit from Ilima |
Day 120 Veranda bench and floor complete !!!! |
Day 120 The kelim in front of the fireplace
|
Day 120 Trying mirrors in bedroom
|
Day 120 Kos kassie in it's permanent position
|
Day 120 Main bedroom
|
Day 121 Screeing last veranda
|
|
Site updated and maintained in McGregor by Mighty-IT
Home :: Aims :: Who Are We :: Up Coming Events :: News
The Little Cottage
:: Sustainable Building :: Alternative Energy
Permaculture :: Holistic Healing :: Donations and Gifts
Resource Centre :: Links :: Contact us